United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) — page 15
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| El Zorro Storage Other · Cypress Creek Renewables |
127 MW | Withdrawn / abandoned |
| Atascosa I Solar Solar · Core Solar |
127 MW | Withdrawn / abandoned |
| Century Oak Wind Onshore wind · Engie |
126 MW | Withdrawn / abandoned |
| Highwire Storage Battery storage · Cypress Creek Renewables |
126 MW | Withdrawn / abandoned |
| Palacios BESS Battery storage · BRP BLUE TOPAZ 11, LLC |
126 MW | Withdrawn / abandoned |
| Roscoe 2 Onshore wind · Airtricity, Inc |
125 MW | Withdrawn / abandoned |
| Magnet Wind Onshore wind · Lane City Wind, LLC |
125 MW | Withdrawn / abandoned |
| Bosque Upgrade Gas · Calpine |
124 MW | Withdrawn / abandoned |
| TXP Reeves G Gas · TXP Holdings |
123 MW | Withdrawn / abandoned |
| TXP Winkler G Gas · TXP Holdings |
123 MW | Withdrawn / abandoned |
| Flamingo Solar Solar · ABEI ENERGY&INFRASTRUCTURE LLC |
123 MW | Withdrawn / abandoned |
| Raven Solar Solar · Raven Solar, LLC |
123 MW | Withdrawn / abandoned |
| Hale Community W 2 Onshore wind · Nextera |
122 MW | Withdrawn / abandoned |
| Desert Vine Solar Solar · Desert Vine Solar LLC |
121 MW | Withdrawn / abandoned |
| Racetrack Solar Solar · Innergex Renewables USA, LLC |
121 MW | Withdrawn / abandoned |
| Normangee Solar Solar · Normangee Solar LLC |
121 MW | Withdrawn / abandoned |
| Dos Rios Energy Storage GIM Other · DOS RIOS SOLAR, LLC |
121 MW | Withdrawn / abandoned |
| EK Tipton Solar Solar · EnergieKontor US Texas SP 1 LLC |
120 MW | Withdrawn / abandoned |
| Murphy Lake Solar Solar · S Power |
120 MW | Withdrawn / abandoned |
| Childress County Wind Onshore wind · CHILDRESS COUNTY WIND 1, LLC |
120 MW | Withdrawn / abandoned |
| SP-TX-08 Solar · Solar Prime |
120 MW | Withdrawn / abandoned |
| Reiher Solar Solar · EnergieKontor US Texas SP 7 LLC |
120 MW | Withdrawn / abandoned |
| Wild Horse Mountain Onshore wind · Iberdrola |
120 MW | Withdrawn / abandoned |
| Pflugerville 2 Solar Solar · RRE Power LLC 1 |
120 MW | Withdrawn / abandoned |
| TX04a Farm Onshore wind · Gamesa energia |
120 MW | Withdrawn / abandoned |
| Sterling Prairie Solar Solar · RWE Solar Development, LLC |
120 MW | Withdrawn / abandoned |
| Crios BESS Placeholder Battery storage · BRP Crios BESS LLC |
118 MW | Withdrawn / abandoned |
| Barrel Summit Storage Other · KCE TX 14, LLC |
117 MW | Withdrawn / abandoned |
| Friendswood II Gas · Friendswood Energy 2 |
117 MW | Withdrawn / abandoned |
| Adamstown Storage Other · Adams Creek Solar Project, LLC |
117 MW | Withdrawn / abandoned |
| Southern Star Solar SLF Solar · Southern Star Solar Project, LLC |
116 MW | Withdrawn / abandoned |
| Holly Branch Storage Battery storage · Holly Branch Solar, LLC |
115 MW | Withdrawn / abandoned |
| Redfish W 2b Onshore wind · Eon |
115 MW | Withdrawn / abandoned |
| Sun Valley 2 Solar · Sun Valley Solar LLC |
115 MW | Withdrawn / abandoned |
| Savanna Prairie Storage Battery storage · Savanna Prairie Storage, LLC |
114 MW | Withdrawn / abandoned |
| Blue Summit W 2 Onshore wind · Nextera |
114 MW | Withdrawn / abandoned |
| Keechi Creek Wind Farm Onshore wind · Texas Land Partners |
113 MW | Withdrawn / abandoned |
| Rustler Solar Solar · Cypress Creek Renewables |
113 MW | Withdrawn / abandoned |
| SSE phase 1 Onshore wind · Spinning Star Energy LLC |
113 MW | Withdrawn / abandoned |
| SSE phase 1 Onshore wind · Spinning Star Energy LLC |
112 MW | Withdrawn / abandoned |
| Green Valley Gas Gas · Denton Municipal Electric |
112 MW | Withdrawn / abandoned |
| Long Draw Energy Project Onshore wind · Turner/Ross Wind Development LLC |
112 MW | Withdrawn / abandoned |
| Pequin BESS Alt#1 Other · Pequin Energy Storage, LLC |
111 MW | Withdrawn / abandoned |
| Miami Wind G3 Onshore wind · Invenergy |
111 MW | Withdrawn / abandoned |
| Galloway 2 Storage Other · 224WB 8ME LLC |
110 MW | Withdrawn / abandoned |
| West Texas Solar 1 Solar · West Texas Solar LLC |
110 MW | Withdrawn / abandoned |
| FAS1 Solar Solar · Macquarie Cap |
110 MW | Withdrawn / abandoned |
| Morgan Ranch Wind Park Onshore wind · Wind Plus (Morgan Ranch Wind Park LLC) |
108 MW | Withdrawn / abandoned |
| Clapton BESS Battery storage · Clapton Storage |
106 MW | Withdrawn / abandoned |
| Sepanta Wind Project Onshore wind · Sepanta Wind Energy, LLC |
106 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)