United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Reiher Solar

Reiher Solar is a 120 MW solar request withdrawn in the ERCOT interconnection queue, in Upton County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2018 (completed)
  2. Withdrawn / abandonedMar 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0159
Grid region
ERCOT (Texas)
Developer
EnergieKontor US Texas SP 7 LLC
Connection point (POI)
76597 Robb Sw 138kV
Location
Upton County, Texas
Technology
Solar: 120 MW
Total requested
120 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
28 January 2018
Proposed online date
December 2023
Withdrawn
March 2023

Location

Marker shows the centre of Upton County; the queue data does not give exact sites.