United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Holly Branch Storage

Holly Branch Storage is a 115 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0148
Grid region
ERCOT (Texas)
Developer
Holly Branch Solar, LLC
Connection point (POI)
Tap 345kV 967 Gibbons Creek - 3400 Twin Oak
Technology
Battery: 115 MW
Total requested
115 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
7 June 2023
Proposed online date
June 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem