United States β€Ί Grid β€Ί Interconnection queues

ONSHORE WIND Β· ERCOT

Redfish W 2b

Redfish W 2b is a 115 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedAug 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
14INR0041b
Grid region
ERCOT (Texas)
Developer
Eon
Connection point (POI)
Perm = tap 8383 NEdinb - 8318 RHondo 345kV, ~10.5 mi to RHondo new sub Bonilla +18 mi gen tie. Temp = tap Ajo-RHondo 345kV, ~13.5 mi to RHondo
Technology
Wind: 115 MW
Total requested
115 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
2 January 2013
Agreement signed
12 August 2015
Proposed online date
December 2016

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem