United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Flamingo Solar

Flamingo Solar is a 123 MW solar request withdrawn in the ERCOT interconnection queue, in Tom Green County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedJun 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0272
Grid region
ERCOT (Texas)
Developer
ABEI ENERGY&INFRASTRUCTURE LLC
Connection point (POI)
tap 138kV 60399 Weiss - 6340 Ballinger
Location
Tom Green County, Texas
Technology
Solar: 123 MW
Total requested
123 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
25 March 2019
Proposed online date
March 2022
Withdrawn
June 2020

Location

Marker shows the centre of Tom Green County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Tom Green County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem