United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTFlamingo Solar
Flamingo Solar is a 123 MW solar request withdrawn in the ERCOT interconnection queue, in Tom Green County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedJun 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0272
- Grid region
- ERCOT (Texas)
- Developer
- ABEI ENERGY&INFRASTRUCTURE LLC
- Connection point (POI)
- tap 138kV 60399 Weiss - 6340 Ballinger
- Location
- Tom Green County, Texas
- Technology
- Solar: 123 MW
- Total requested
- 123 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 25 March 2019
- Proposed online date
- March 2022
- Withdrawn
- June 2020
Location
Marker shows the centre of Tom Green County; the queue data does not give exact sites.
Other requests in Tom Green County
- Water Valley Wind EnergyOnshore wind Β· 180 MW Β· agreement signed
- Moon Chapel WindOnshore wind Β· 379 MW Β· in study
- Fort Concho Energy storageBattery storage Β· 251 MW Β· in study
- Hofbrau BESSBattery storage Β· 181 MW Β· in study
- Zeppelin Energy StorageBattery storage Β· 164 MW Β· in study
- Dove Creek SolarSolar + storage Β· 164 MW Β· in study
- Dove Creek StorageSolar + storage Β· 163 MW Β· in study
- Morning Glory SolarSolar Β· 122 MW Β· in study
- Knickerbocker StorageOther Β· 25.0 MW Β· suspended
- Rambler SolarSolar Β· 200 MW Β· built
- Angelo SolarSolar Β· 195 MW Β· built
- Ratliff (Concho Valley) SolarSolar Β· 160 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem