United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTKnickerbocker Storage
Knickerbocker Storage is a 25.0 MW other request suspended in the ERCOT interconnection queue, in Tom Green County, Texas.
Queue statusPaused / redesign
- PlanningQueued Dec 2019 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 21INR0446
- Grid region
- ERCOT (Texas)
- Developer
- Knickerbocker Solar LLC
- Connection point (POI)
- Tap 345kV 76003 Big Hill - 76009 Twin Buttes
- Location
- Tom Green County, Texas
- Technology
- Other: 25.0 MW
- Total requested
- 25.0 MW
- Study phase
- FIS
- Queue status
- Suspended
- Entered queue
- 18 December 2019
- Proposed online date
- June 2028
Location
Marker shows the centre of Tom Green County; the queue data does not give exact sites.
Other requests in Tom Green County
- Water Valley Wind EnergyOnshore wind Β· 180 MW Β· agreement signed
- Moon Chapel WindOnshore wind Β· 379 MW Β· in study
- Fort Concho Energy storageBattery storage Β· 251 MW Β· in study
- Hofbrau BESSBattery storage Β· 181 MW Β· in study
- Zeppelin Energy StorageBattery storage Β· 164 MW Β· in study
- Dove Creek SolarSolar + storage Β· 164 MW Β· in study
- Dove Creek StorageSolar + storage Β· 163 MW Β· in study
- Morning Glory SolarSolar Β· 122 MW Β· in study
- Rambler SolarSolar Β· 200 MW Β· built
- Angelo SolarSolar Β· 195 MW Β· built
- Ratliff (Concho Valley) SolarSolar Β· 160 MW Β· built
- Angelo StorageOther Β· 103 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem