United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTGalloway 2 Storage
Galloway 2 Storage is a 110 MW other request withdrawn in the ERCOT interconnection queue, in Concho County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2019 (completed)
- Withdrawn / abandonedJul 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0411
- Grid region
- ERCOT (Texas)
- Developer
- 224WB 8ME LLC
- Connection point (POI)
- tap 345kV 76009 Twin Buttes - 1444 Brown
- Location
- Concho County, Texas
- Technology
- Other: 110 MW
- Total requested
- 110 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 4 August 2019
- Proposed online date
- December 2021
- Withdrawn
- July 2020
Location
Marker shows the centre of Concho County; the queue data does not give exact sites.
Other requests in Concho County
- Operation SunshineSolar + storage Β· 603 MW Β· agreement signed
- Operation Sunshine StorageSolar + storage Β· 410 MW Β· agreement signed
- Lucy SolarSolar Β· 352 MW Β· agreement signed
- Concho Pearl SolarSolar + storage Β· 172 MW Β· agreement signed
- Concho Pearl StorageSolar + storage Β· 162 MW Β· agreement signed
- Paint Rock WindOnshore wind Β· 379 MW Β· in study
- Cherry Sage Storage 1 SLFSolar + storage Β· 150 MW Β· in study
- Cherry Sage Solar 1 SLFSolar + storage Β· 143 MW Β· in study
- Old Sorrell Energy StorageBattery storage Β· 43.1 MW Β· suspended
- Maverick Creek I WindOnshore wind Β· 373 MW Β· built
- Galloway SolarSolar Β· 250 MW Β· built
- Cactus Flats WindOnshore wind Β· 148 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem