ONSHORE WIND Β· ERCOTMiami Wind G3
Miami Wind G3 is a 111 MW onshore wind request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2011 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedMar 2013 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 14INR0012b
- Grid region
- ERCOT (Texas)
- Developer
- Invenergy
- Connection point (POI)
- Gray (140471)
- Technology
- Wind: 111 MW
- Total requested
- 111 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 1 June 2011
- Agreement signed
- 1 March 2013
- Proposed online date
- May 2016
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem