ONSHORE WIND Β· ERCOT

Miami Wind G3

Miami Wind G3 is a 111 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedMar 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
14INR0012b
Grid region
ERCOT (Texas)
Developer
Invenergy
Connection point (POI)
Gray (140471)
Technology
Wind: 111 MW
Total requested
111 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
1 June 2011
Agreement signed
1 March 2013
Proposed online date
May 2016

Location

No county location in the queue data.

Power plants in Β· Transmission lines in