ONSHORE WIND Β· ERCOT

SSE phase 1

SSE phase 1 is a 112 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2012 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
12INR0081a
Grid region
ERCOT (Texas)
Developer
Spinning Star Energy LLC
Technology
Wind: 112 MW
Total requested
112 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
18 December 2012
Proposed online date
December 2013

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem