SOLAR Β· ERCOT

Normangee Solar

Normangee Solar is a 121 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2023 (completed)
  2. Withdrawn / abandonedMar 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0320
Grid region
ERCOT (Texas)
Developer
Normangee Solar LLC
Connection point (POI)
Tap 345kV 3391Jewett - 44645 Singleton
Technology
Solar: 121 MW
Total requested
121 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
13 March 2023
Proposed online date
June 2027
Withdrawn
March 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem