SOLAR Β· ERCOT

Southern Star Solar SLF

Southern Star Solar SLF is a 116 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
29INR0075
Grid region
ERCOT (Texas)
Developer
Southern Star Solar Project, LLC
Connection point (POI)
To Tap 138 kV Bigfoot (Bus# 8221) to Pleasanton (Bus# 8203) Transmission Line
Technology
Solar: 116 MW
Total requested
116 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
24 March 2025
Proposed online date
May 2029

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem