United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTEK Tipton Solar
EK Tipton Solar is a 120 MW solar request withdrawn in the ERCOT interconnection queue, in Reeves County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2018 (completed)
- Withdrawn / abandonedJul 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0128
- Grid region
- ERCOT (Texas)
- Developer
- EnergieKontor US Texas SP 1 LLC
- Connection point (POI)
- 6673 Musquiz 138kV
- Location
- Reeves County, Texas
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 26 September 2018
- Proposed online date
- December 2023
- Withdrawn
- July 2022
Location
Marker shows the centre of Reeves County; the queue data does not give exact sites.
Other requests in Reeves County
- Cantaloupe SolarSolar Β· 307 MW Β· agreement signed
- August Draw SolarSolar Β· 250 MW Β· agreement signed
- Bracero Pecan StorageBattery storage Β· 238 MW Β· agreement signed
- Tolivar Power Plant (TEF- Due Diligence)Gas Β· 225 MW Β· agreement signed
- Elm Street BESS2Battery storage Β· 10.0 MW Β· agreement signed
- Saddleback AGR1Other Β· 10.0 MW Β· agreement signed
- Coyote Springs AGR1Other Β· 10.0 MW Β· agreement signed
- County Road BESSBattery storage Β· 9.9 MW Β· agreement signed
- Elm Street BESSBattery storage Β· 9.9 MW Β· agreement signed
- Wolf Bone North Energy CenterGas Β· 1,204 MW Β· in study
- Kilby1 Part 4 Large Block Simple CycleGas Β· 950 MW Β· in study
- Exergy Energy West Texas Natural Gas Reciprocating Power IGas Β· 400 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem