United States โบ Grid โบ Interconnection queues โบ Connecticut
OCTARY USA ยท INTERCONNECTION QUEUESWithdrawn queue requests in Connecticut
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Offshore Wind Offshore wind |
1,275 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
1,275 MW | Withdrawn / abandoned |
| Offshore Wind Increase Offshore wind |
1,200 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
1,200 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
1,200 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
1,200 MW | Withdrawn / abandoned |
| Combined Cycle Gas |
1,120 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
805 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
805 MW | Withdrawn / abandoned |
| Combined Cycle Gas |
745 MW | Withdrawn / abandoned |
| Combined Cycle Gas |
695 MW | Withdrawn / abandoned |
| Combined Cycle Gas |
680 MW | Withdrawn / abandoned |
| NTE Connecticut Gas |
672 MW | Withdrawn / abandoned |
| Combined Cycle Gas |
563 MW | Withdrawn / abandoned |
| Combined Cycle Gas |
550 MW | Withdrawn / abandoned |
| Meriden Gas Turbines Gas |
510 MW | Withdrawn / abandoned |
| Towantic Energy Gas |
452 MW | Withdrawn / abandoned |
| Simple Cycle Combustion Turbine Repowering (alternative to Q647) Gas |
378 MW | Withdrawn / abandoned |
| Gas Turbine Repowering Gas |
378 MW | Withdrawn / abandoned |
| Gas Turbine (alt. to QP412) Gas |
335 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
326 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
326 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
325 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
305 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
300 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
300 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
300 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
289 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
289 MW | Withdrawn / abandoned |
| Battery Storage Addition Battery storage |
284 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
275 MW | Withdrawn / abandoned |
| Combined Cycle Other |
269 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
263 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
257 MW | Withdrawn / abandoned |
| Combined Cycle Gas |
250 MW | Withdrawn / abandoned |
| Combustion Turbine Other |
245 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
238 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
238 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
233 MW | Withdrawn / abandoned |
| Combined Cycle Gas |
223 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
205 MW | Withdrawn / abandoned |
| Waterside Power - 180 MW Gas |
204 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
201 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
200 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
200 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
197 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
189 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
185 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
175 MW | Withdrawn / abandoned |
| Gas Turbine Capacity Increase ( See queue position Gas |
175 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)