United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

GAS Β· ISO-NE

Combined Cycle

Combined Cycle is a 695 MW gas request withdrawn in the ISO-NE interconnection queue, in Fairfield County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2008 (completed)
  2. Withdrawn / abandonedFeb 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
277
Grid region
ISO-NE (New England)
Connection point (POI)
CL&P 345 KV 321 line
Location
Fairfield County, Connecticut
Technology
Gas: 695 MW Β· Oil
Total requested
695 MW
Service type
Other
Queue status
Withdrawn
Entered queue
12 September 2008
Proposed online date
June 2013
Withdrawn
February 2009

Location

No county location in the queue data.

Power plants in Connecticut Β· Transmission lines in Connecticut

Other requests in Fairfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem