Combined Cycle is a 745 MW gas request withdrawn in the ISO-NE interconnection queue, in Fairfield County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2011 (completed)
  2. Withdrawn / abandonedNov 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
369
Grid region
ISO-NE (New England)
Connection point (POI)
NU 345 kV Line
Location
Fairfield County, Connecticut
Technology
Gas: 745 MW
Total requested
745 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
8 June 2011
Proposed online date
June 2016
Withdrawn
November 2011

Location

No county location in the queue data.

Power plants in Connecticut Β· Transmission lines in Connecticut

Other requests in Fairfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem