United States › Grid › Interconnection queues › Connecticut

OTHER · ISO-NE

Waterside Power, LLC

Waterside Power, LLC is a 74.1 MW other request built and operating in the ISO-NE interconnection queue, in Fairfield County, Connecticut.

Queue statusOperating
  1. PlanningQueued Oct 2003 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingTarget Jun 2004 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
114
Grid region
ISO-NE (New England)
Connection point (POI)
Waterside 115 kV
Location
Fairfield County, Connecticut
Technology
Oil: 74.1 MW
Total requested
74.1 MW
Service type
Other
Study phase
IA Executed
Queue status
Operational
Entered queue
2 October 2003
Proposed online date
June 2004

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in Fairfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem