United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

OFFSHORE WIND Β· ISO-NE

Offshore Wind Increase

Offshore Wind Increase is a 1,200 MW offshore wind request withdrawn in the ISO-NE interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1060
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource (CL&P) Millstone 345 kV substation
Location
Connecticut
Technology
Offshore Wind: 1,200 MW
Total requested
1,200 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
9 September 2020
Proposed online date
November 2027
Withdrawn
October 2025

Location

No county location in the queue data.

Power plants in Connecticut Β· Transmission lines in Connecticut

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem