United States βΊ Grid βΊ Interconnection queues βΊ Connecticut
GAS Β· ISO-NECombined Cycle
Combined Cycle is a 223 MW gas request withdrawn in the ISO-NE interconnection queue, in New London County, Connecticut.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2006 (completed)
- Withdrawn / abandonedApr 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 161
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Montville Substation
- Location
- New London County, Connecticut
- Technology
- Gas: 223 MW
- Total requested
- 223 MW
- Service type
- Other
- Queue status
- Withdrawn
- Entered queue
- 5 July 2006
- Proposed online date
- May 2013
- Withdrawn
- April 2009
Location
No county location in the queue data.
Power plants in Connecticut Β· Transmission lines in Connecticut
Other requests in New London County
- Millstone 2 Upgrade7Nuclear Β· 906 MW Β· built
- Increase Existing CapacityNuclear Β· 70.0 MW Β· built
- Millstone IncreaseNuclear Β· 37.0 MW Β· built
- Fusion Solar CenterSolar Β· 20.0 MW Β· built
- SolarSolar Β· 17.7 MW Β· built
- SolarSolar Β· 15.0 MW Β· built
- Rand-Whitney Co-GenGas Β· 14.9 MW Β· built
- Foxwoods Central PlantGas Β· 13.2 MW Β· built
- Bloom Energy Fuel CellOther Β· 10.2 MW Β· built
- SolarSolar Β· 10.0 MW Β· built
- Battery StorageBattery storage Β· 300 MW Β· withdrawn
- Battery StorageBattery storage Β· 289 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem