OTHER · ISO-NEBloom Energy Fuel Cell
Bloom Energy Fuel Cell is a 10.2 MW other request built and operating in the ISO-NE interconnection queue, in New London County, Connecticut, connecting to NU.
Request details
- Queue ID
- 912
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- NU
- Connection point (POI)
- Eversource Willimantic 14S
- Location
- New London County, Connecticut
- Technology
- Other: 10.2 MW
- Total requested
- 10.2 MW
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 23 August 2019
- Proposed online date
- October 2021
Location
No county location in the queue data.
Power plants in Connecticut · Transmission lines in Connecticut
Other requests in New London County
- Millstone 2 Upgrade7Nuclear · 906 MW · built
- Increase Existing CapacityNuclear · 70.0 MW · built
- Millstone IncreaseNuclear · 37.0 MW · built
- Fusion Solar CenterSolar · 20.0 MW · built
- SolarSolar · 17.7 MW · built
- SolarSolar · 15.0 MW · built
- Rand-Whitney Co-GenGas · 14.9 MW · built
- Foxwoods Central PlantGas · 13.2 MW · built
- SolarSolar · 10.0 MW · built
- Battery StorageBattery storage · 300 MW · withdrawn
- Battery StorageBattery storage · 289 MW · withdrawn
- Battery StorageBattery storage · 257 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem