United States › Grid › Interconnection queues › Connecticut
SOLAR · ISO-NEFusion Solar Center
Fusion Solar Center is a 20.0 MW solar request built and operating in the ISO-NE interconnection queue, in New London County, Connecticut, connecting to NU.
Request details
- Queue ID
- 715
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- NU
- Connection point (POI)
- Eversource Tunnel 12S
- Location
- New London County, Connecticut
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 21 February 2018
- Proposed online date
- April 2018
Location
No county location in the queue data.
Power plants in Connecticut · Transmission lines in Connecticut
Other requests in New London County
- Millstone 2 Upgrade7Nuclear · 906 MW · built
- Increase Existing CapacityNuclear · 70.0 MW · built
- Millstone IncreaseNuclear · 37.0 MW · built
- SolarSolar · 17.7 MW · built
- SolarSolar · 15.0 MW · built
- Rand-Whitney Co-GenGas · 14.9 MW · built
- Foxwoods Central PlantGas · 13.2 MW · built
- Bloom Energy Fuel CellOther · 10.2 MW · built
- SolarSolar · 10.0 MW · built
- Battery StorageBattery storage · 300 MW · withdrawn
- Battery StorageBattery storage · 289 MW · withdrawn
- Battery StorageBattery storage · 257 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem