United States βΊ Grid βΊ Interconnection queues βΊ Connecticut
OFFSHORE WIND Β· ISO-NEOffshore Wind
Offshore Wind is a 1,200 MW offshore wind request withdrawn in the ISO-NE interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1058
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Eversource (CL&P) Millstone 345 kV substation
- Location
- Connecticut
- Technology
- Offshore Wind: 1,200 MW
- Total requested
- 1,200 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 9 September 2020
- Proposed online date
- November 2027
- Withdrawn
- October 2025
Location
No county location in the queue data.