United States βΊ Grid βΊ Interconnection queues βΊ Connecticut
GAS Β· ISO-NECombined Cycle
Combined Cycle is a 550 MW gas request withdrawn in the ISO-NE interconnection queue, in Litchfield County, Connecticut.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2006 (completed)
- Withdrawn / abandonedMar 2007 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 192
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- CL&P Frostbridge Substation
- Location
- Litchfield County, Connecticut
- Technology
- Gas: 550 MW Β· Oil
- Total requested
- 550 MW
- Service type
- Other
- Queue status
- Withdrawn
- Entered queue
- 28 December 2006
- Proposed online date
- June 2010
- Withdrawn
- March 2007
Location
No county location in the queue data.
Power plants in Connecticut Β· Transmission lines in Connecticut
Other requests in Litchfield County
- Battery StorageBattery storage Β· 142 MW Β· agreement signed
- Kimberly Clark-Unit 1Gas Β· 28.0 MW Β· built
- SolarSolar Β· 19.8 MW Β· built
- Battery StorageBattery storage Β· 142 MW Β· withdrawn
- Battery StorageBattery storage Β· 45.3 MW Β· withdrawn
- BiomassOther Β· 42.0 MW Β· withdrawn
- Gas TurbineGas Β· 39.0 MW Β· withdrawn
- Biomass ProjectOther Β· 26.0 MW Β· withdrawn
- SolarSolar Β· 20.0 MW Β· withdrawn
- WindOnshore wind Β· 3.8 MW Β· withdrawn
- EE CT DER Group StudySolar Β· 3.7 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem