United States › Grid › Interconnection queues › Connecticut

SOLAR · ISO-NE

EE CT DER Group Study

EE CT DER Group Study is a 3.7 MW solar request withdrawn in the ISO-NE interconnection queue, in Litchfield County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2024 (completed)
  2. Withdrawn / abandonedMay 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1536
Grid region
ISO-NE (New England)
Connection point (POI)
EE WINSTED 33B/CAMPVILLE
Location
Litchfield County, Connecticut
Technology
Solar: 3.7 MW
Total requested
3.7 MW
Queue status
Withdrawn
Entered queue
15 May 2024
Proposed online date
July 2024
Withdrawn
May 2024

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in Litchfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem