United States βΊ Grid βΊ Interconnection queues βΊ Connecticut
SOLAR Β· ISO-NESolar
Solar is a 19.8 MW solar request built and operating in the ISO-NE interconnection queue, in Litchfield County, Connecticut, connecting to NU.
Request details
- Queue ID
- 710
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- NU
- Connection point (POI)
- Eversource 14R31 Feeder
- Location
- Litchfield County, Connecticut
- Technology
- Solar: 19.8 MW
- Total requested
- 19.8 MW
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 21 February 2018
- Proposed online date
- March 2024
Location
No county location in the queue data.
Power plants in Connecticut Β· Transmission lines in Connecticut
Other requests in Litchfield County
- Battery StorageBattery storage Β· 142 MW Β· agreement signed
- Kimberly Clark-Unit 1Gas Β· 28.0 MW Β· built
- Combined CycleGas Β· 550 MW Β· withdrawn
- Battery StorageBattery storage Β· 142 MW Β· withdrawn
- Battery StorageBattery storage Β· 45.3 MW Β· withdrawn
- BiomassOther Β· 42.0 MW Β· withdrawn
- Gas TurbineGas Β· 39.0 MW Β· withdrawn
- Biomass ProjectOther Β· 26.0 MW Β· withdrawn
- SolarSolar Β· 20.0 MW Β· withdrawn
- WindOnshore wind Β· 3.8 MW Β· withdrawn
- EE CT DER Group StudySolar Β· 3.7 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem