United States › Grid › Interconnection queues › Connecticut

BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 45.3 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Litchfield County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2024 (completed)
  2. Withdrawn / abandonedAug 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1562
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource 115 kV Line from Frost Bridge #8R to Carmel Hill #11S
Location
Litchfield County, Connecticut
Technology
Battery: 45.3 MW
Total requested
45.3 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
7 June 2024
Proposed online date
June 2027
Withdrawn
August 2024

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in Litchfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem