United States βΊ Grid βΊ Interconnection queues βΊ Connecticut
GAS Β· ISO-NETowantic Energy
Towantic Energy is a 452 MW gas request withdrawn in the ISO-NE interconnection queue, in New Haven County, Connecticut.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2007 (completed)
- Withdrawn / abandonedJan 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 207
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- CL&P 115 kV lines between Baldwin Junction and Bea
- Location
- New Haven County, Connecticut
- Technology
- Gas: 452 MW Β· Oil
- Total requested
- 452 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 3 April 2007
- Proposed online date
- December 2014
- Withdrawn
- January 2012
Location
No county location in the queue data.
Power plants in Connecticut Β· Transmission lines in Connecticut
Other requests in New Haven County
- Naugatuck Avenue Battery StorageBattery storage Β· 205 MW Β· agreement signed
- CPV Towantic Energy CenterGas Β· 745 MW Β· built
- Wallingford GT UprateGas Β· 350 MW Β· built
- New Haven Harbor 2-4Gas Β· 130 MW Β· built
- Wallingford Energy CenterGas Β· 100 MW Β· built
- A. L. PierceGas Β· 99.6 MW Β· built
- Waterbury Generating FacilityGas Β· 95.7 MW Β· built
- CPV Towantic IncreaseGas Β· 55.5 MW Β· built
- CPV Towantic incrementalGas Β· 45.0 MW Β· built
- Devon 10Other Β· 20.0 MW Β· built
- Milford Upgrades - Phase IGas Β· 16.6 MW Β· built
- Wallingford SolarSolar Β· 15.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem