United States › Grid › Interconnection queues › Connecticut

GAS · ISO-NE

Meriden Gas Turbines

Meriden Gas Turbines is a 510 MW gas request withdrawn in the ISO-NE interconnection queue, in New Haven County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2007 (completed)
  2. Withdrawn / abandonedMay 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
222
Grid region
ISO-NE (New England)
Connection point (POI)
Haddam Neck-Southington 345 kV line
Location
New Haven County, Connecticut
Technology
Gas: 510 MW · Oil
Total requested
510 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
16 July 2007
Proposed online date
June 2015
Withdrawn
May 2012

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in New Haven County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem