United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

GAS Β· ISO-NE

Gas Turbine

Gas Turbine is a 275 MW gas request withdrawn in the ISO-NE interconnection queue, in Hartford County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2007 (completed)
  2. Withdrawn / abandonedJan 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
232
Grid region
ISO-NE (New England)
Connection point (POI)
CL&P 329 345 kV line or 1895 115 kV line
Location
Hartford County, Connecticut
Technology
Gas: 275 MW Β· Oil
Total requested
275 MW
Service type
Other
Queue status
Withdrawn
Entered queue
1 November 2007
Proposed online date
June 2010
Withdrawn
January 2008

Location

No county location in the queue data.

Power plants in Connecticut Β· Transmission lines in Connecticut

Other requests in Hartford County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem