United States βΊ Grid βΊ Interconnection queues βΊ Connecticut
GAS Β· ISO-NEGas Turbine
Gas Turbine is a 275 MW gas request withdrawn in the ISO-NE interconnection queue, in Hartford County, Connecticut.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2007 (completed)
- Withdrawn / abandonedJan 2008 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 232
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- CL&P 329 345 kV line or 1895 115 kV line
- Location
- Hartford County, Connecticut
- Technology
- Gas: 275 MW Β· Oil
- Total requested
- 275 MW
- Service type
- Other
- Queue status
- Withdrawn
- Entered queue
- 1 November 2007
- Proposed online date
- June 2010
- Withdrawn
- January 2008
Location
No county location in the queue data.
Power plants in Connecticut Β· Transmission lines in Connecticut
Other requests in Hartford County
- SolarSolar Β· 150 MW Β· agreement signed
- Broadleaf SolarSolar Β· 101 MW Β· agreement signed
- SolarSolar Β· 25.0 MW Β· in study
- Solar IncreaseSolar Β· 5.0 MW Β· in study
- Gravel Pit SolarSolar Β· 50.0 MW Β· built
- Algonquin Power Windsor Locks Cogeneration FacilitGas Β· 47.5 MW Β· built
- Gravel Pit Solar IncreaseSolar Β· 45.0 MW Β· built
- SolarSolar Β· 26.4 MW Β· built
- Gravel Pit Solar increaseSolar Β· 25.0 MW Β· built
- NB Fuel CellGas Β· 20.2 MW Β· built
- Nutmeg Solar, LLCSolar Β· 19.9 MW Β· built
- Hamilton SundstrandGas Β· 5.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem