United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

OTHER Β· ISO-NE

Combined Cycle

Combined Cycle is a 269 MW other request withdrawn in the ISO-NE interconnection queue, in Fairfield County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2008 (completed)
  2. Withdrawn / abandonedJun 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
253
Grid region
ISO-NE (New England)
Connection point (POI)
CL&P 115 kV 1876 line
Location
Fairfield County, Connecticut
Technology
Oil: 269 MW
Total requested
269 MW
Service type
Other
Queue status
Withdrawn
Entered queue
11 March 2008
Proposed online date
June 2011
Withdrawn
June 2009

Location

No county location in the queue data.

Power plants in Connecticut Β· Transmission lines in Connecticut

Other requests in Fairfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem