Gas Turbine Capacity Increase ( See queue position

Gas Turbine Capacity Increase ( See queue position is a 175 MW gas request withdrawn in the ISO-NE interconnection queue, in Fairfield County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2008 (completed)
  2. Withdrawn / abandonedMar 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
267
Grid region
ISO-NE (New England)
Connection point (POI)
345 kV line # 321
Location
Fairfield County, Connecticut
Technology
Gas: 175 MW · Oil
Total requested
175 MW
Service type
Other
Queue status
Withdrawn
Entered queue
24 June 2008
Proposed online date
June 2011
Withdrawn
March 2009

Location

No county location in the queue data.