🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Connecticut

GAS · ISO-NE

Gas Turbine Repowering

Gas Turbine Repowering is a 378 MW gas request withdrawn in the ISO-NE interconnection queue, in Middlesex County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2017 (completed)
  2. Withdrawn / abandonedJun 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
648
Grid region
ISO-NE (New England)
Connection point (POI)
Middletown Station 345KV Substation
Location
Middlesex County, Connecticut
Technology
Gas: 378 MW · Oil
Total requested
378 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
28 April 2017
Proposed online date
May 2021
Withdrawn
June 2017

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in Middlesex County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem