United States › Grid › Interconnection queues › Connecticut

BATTERY STORAGE · ISO-NE

EE CT DER Group Study

EE CT DER Group Study is a 20.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Middlesex County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2024 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1539
Grid region
ISO-NE (New England)
Connection point (POI)
EE 30K DOOLEY
Location
Middlesex County, Connecticut
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Queue status
Withdrawn
Entered queue
15 May 2024
Proposed online date
April 2027
Withdrawn
June 2025

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in Middlesex County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem