GAS Β· ISO-NEGas Turbine
Gas Turbine is a 82.2 MW gas request withdrawn in the ISO-NE interconnection queue, in Middlesex County, Connecticut.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2006 (completed)
- Withdrawn / abandonedNov 2008 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 160
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- CL&P Middletown Substation
- Location
- Middlesex County, Connecticut
- Technology
- Gas: 82.2 MW Β· Oil
- Total requested
- 82.2 MW
- Service type
- Other
- Queue status
- Withdrawn
- Entered queue
- 30 June 2006
- Proposed online date
- May 2011
- Withdrawn
- November 2008
Location
No county location in the queue data.
Power plants in Connecticut Β· Transmission lines in Connecticut
Other requests in Middlesex County
- Kleen Energy ProjectGas Β· 620 MW Β· built
- Utc - P&WaGas Β· 7.5 MW Β· built
- Simple Cycle Combustion Turbine Repowering (alternative to Q647)Gas Β· 378 MW Β· withdrawn
- Gas Turbine RepoweringGas Β· 378 MW Β· withdrawn
- Battery StorageBattery storage Β· 305 MW Β· withdrawn
- Battery StorageBattery storage Β· 289 MW Β· withdrawn
- Battery Storage AdditionBattery storage Β· 284 MW Β· withdrawn
- Battery StorageBattery storage Β· 80.9 MW Β· withdrawn
- Gas turbine repowering (Alt. to Q647)Gas Β· 23.0 MW Β· withdrawn
- Gas turbine repoweringGas Β· 23.0 MW Β· withdrawn
- EE CT DER Group StudyBattery storage Β· 20.0 MW Β· withdrawn
- Battery StorageBattery storage Β· 10.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem