Gas Turbine (alt. to QP412) is a 335 MW gas request withdrawn in the ISO-NE interconnection queue, in Fairfield County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2014 (completed)
  2. Withdrawn / abandonedNov 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
436
Grid region
ISO-NE (New England)
Connection point (POI)
345 kV generator side connection to the transmission grid.
Location
Fairfield County, Connecticut
Technology
Gas: 335 MW · Oil
Total requested
335 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
5 February 2014
Proposed online date
May 2018
Withdrawn
November 2014

Location

No county location in the queue data.