United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

GAS Β· ISO-NE

Combined Cycle

Combined Cycle is a 680 MW gas request withdrawn in the ISO-NE interconnection queue, in Fairfield County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2012 (completed)
  2. Withdrawn / abandonedMar 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
388
Grid region
ISO-NE (New England)
Connection point (POI)
UI 115 kV or 345 kV
Location
Fairfield County, Connecticut
Technology
Gas: 680 MW
Total requested
680 MW
Queue status
Withdrawn
Entered queue
13 January 2012
Proposed online date
May 2016
Withdrawn
March 2013

Location

No county location in the queue data.

Power plants in Connecticut Β· Transmission lines in Connecticut

Other requests in Fairfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem