BATTERY STORAGE · ISO-NEBattery Storage
Battery Storage is a 201 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Fairfield County, Connecticut.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2023 (completed)
- Withdrawn / abandonedAug 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1366
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Peaceable 115 kV station
- Location
- Fairfield County, Connecticut
- Technology
- Battery: 201 MW
- Total requested
- 201 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 9 March 2023
- Proposed online date
- November 2026
- Withdrawn
- August 2024
Location
No county location in the queue data.
Power plants in Connecticut · Transmission lines in Connecticut
Other requests in Fairfield County
- Bridgeport Energy PSS TuningGas · 588 MW · built
- PSEG Bridgeport Harbor CCGT ExpansionGas · 510 MW · built
- Bridgeport Energy UprateGas · 84.0 MW · built
- Waterside Power, LLCOther · 74.1 MW · built
- Cos Cob RedevelopmentOther · 45.8 MW · built
- SNEW Summer '03 Temporary GeneratorGas · 19.4 MW · built
- Third Taxing District Units 1, 2 & 3Other · 6.0 MW · built
- Bridgeport Fuel Cell 2Gas · 5.6 MW · built
- Fairfield UniversityGas · 5.0 MW · built
- Combined Cycle UpgradeGas · 4.0 MW · built
- Bridgeport Harbor Unit #5 UprateGas · 0.4 MW · built
- Combined CycleGas · 745 MW · withdrawn