OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) (2018 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| R-Cube Wind Onshore wind · Nextera |
1,000 MW | Withdrawn / abandoned |
| Point Mountain Solar Solar · Hecate Energy |
514 MW | Withdrawn / abandoned |
| Juno Storage Other · Intersect Power |
495 MW | Withdrawn / abandoned |
| Ponta Power Plant Gas · Pro Energy Services LLC |
484 MW | Withdrawn / abandoned |
| Spectrum Solar Solar · IP Spectrum, LLC |
400 MW | Withdrawn / abandoned |
| Black Angus Onshore wind · Apex Clean |
353 MW | Withdrawn / abandoned |
| Azure Sky Wind 1 Onshore wind · Tradewind Energy |
350 MW | Withdrawn / abandoned |
| Gusty Hill Wind Onshore wind · Gusty Hill Wind Project, LLC |
350 MW | Withdrawn / abandoned |
| Elrond Solar · IP Elrond, LLC |
313 MW | Withdrawn / abandoned |
| Lumina Solar Solar · IP Lumina, LLC |
313 MW | Withdrawn / abandoned |
| Great Dane Wind Onshore wind · Seventus |
303 MW | Withdrawn / abandoned |
| Fort McKavett Wind Onshore wind · Nextera |
300 MW | Withdrawn / abandoned |
| Tiger Wind Onshore wind · Nextera |
300 MW | Withdrawn / abandoned |
| Callisto Solar · Intersect Power |
300 MW | Withdrawn / abandoned |
| Double R Solar Solar · Double R Solar Farm |
280 MW | Withdrawn / abandoned |
| El Zorro Solar Solar · Cypress Creek Renewables |
253 MW | Withdrawn / abandoned |
| Highwire Solar Solar · Cypress Creek Renewables |
249 MW | Withdrawn / abandoned |
| Loma Pinta II Onshore wind · Enerverse |
202 MW | Withdrawn / abandoned |
| Vaquero 2 Wind Onshore wind · Enerverse |
202 MW | Withdrawn / abandoned |
| Barranca Wind II Onshore wind · Barranca Wind Energy LLC |
202 MW | Withdrawn / abandoned |
| Barranca Wind Onshore wind · Barranca Wind Energy LLC |
202 MW | Withdrawn / abandoned |
| Danish Fields II Solar Solar · Danish Fields Solar, LLC |
201 MW | Withdrawn / abandoned |
| Danish Fields III Solar Solar · Danish Fields Solar, LLC |
201 MW | Withdrawn / abandoned |
| Bravepost Solar Solar · Recurrent Energy |
200 MW | Withdrawn / abandoned |
| M-Bar Solar Solar · M-Bar Solar Facility |
200 MW | Withdrawn / abandoned |
| Cunningham Solar 2 Solar · Invenergy |
200 MW | Withdrawn / abandoned |
| Equinox Solar 1 Solar · Invenergy Solar Project Development LLC |
200 MW | Withdrawn / abandoned |
| Alwest Gas |
200 MW | Withdrawn / abandoned |
| Thunder Creek Onshore wind · Nextera |
200 MW | Withdrawn / abandoned |
| Walstrom Gas · Castleman Power |
200 MW | Withdrawn / abandoned |
| Cunningham Solar 3 Solar · Invenergy |
200 MW | Withdrawn / abandoned |
| Cunningham Solar 1 Solar · Invenergy |
200 MW | Withdrawn / abandoned |
| Equinox Solar 2 Solar · Invenergy Solar Project Development LLC |
200 MW | Withdrawn / abandoned |
| Prairie Point Wind Onshore wind · Nextera |
200 MW | Withdrawn / abandoned |
| Cottonwood Bayou Solar II Solar · Cottonwood Bayou Solar, LLC |
200 MW | Withdrawn / abandoned |
| Robles Solar Solar · Cypress Creek Renewables |
200 MW | Withdrawn / abandoned |
| Lacy Creek Wind Phase 1 Onshore wind |
200 MW | Withdrawn / abandoned |
| Half Moon Solar (supsended) Solar · Nextera |
181 MW | Withdrawn / abandoned |
| Dillon Gulch Wind Onshore wind · AES |
175 MW | Withdrawn / abandoned |
| Dusky Solar Solar · Cypress Creek Renewables |
165 MW | Withdrawn / abandoned |
| Cowboy Solar Solar · AP Solar Holdings LLC |
153 MW | Withdrawn / abandoned |
| Timberwolf POI A Solar Solar · CED Crane Solar 2, LLC |
152 MW | Withdrawn / abandoned |
| Altajac Gas · Alta Power |
150 MW | Withdrawn / abandoned |
| Avocet Gas · Alta Power Lufkin Acovet |
150 MW | Withdrawn / abandoned |
| Osprey1 Gas · Alta Power LLC |
150 MW | Withdrawn / abandoned |
| GoodAlta GT Gas · Alta Power |
150 MW | Withdrawn / abandoned |
| Concho Valley Solar Solar · Merit SI |
150 MW | Withdrawn / abandoned |
| Thickgrass Solar Solar · Origis Energy |
149 MW | Withdrawn / abandoned |
| French Goldston Solar Solar · Belltown Power |
144 MW | Withdrawn / abandoned |
| Gold Creek Solar Solar · S Power |
140 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)306 · 50.5 GW
- PJM (Mid-Atlantic, Midwest)311 · 46.6 GW
- MISO (Midcontinent)165 · 28.2 GW
- Southeast (non-ISO utilities)248 · 28.2 GW
- CAISO (California)67 · 21.7 GW
- SPP (Southwest Power Pool)92 · 16.8 GW
- ERCOT (Texas)77 · 15.0 GW
- NYISO (New York)74 · 11.2 GW
- ISO-NE (New England)84 · 8,151 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)