SOLAR Β· ERCOTBravepost Solar
Bravepost Solar is a 200 MW solar request withdrawn in the ERCOT interconnection queue, in Tom Green County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2018 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- ConsentedOct 2019 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0053
- Grid region
- ERCOT (Texas)
- Developer
- Recurrent Energy
- Connection point (POI)
- 6444 Red Creek 345kV
- Location
- Tom Green County, Texas
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 21 February 2018
- Agreement signed
- 30 October 2019
- Proposed online date
- December 2024
- Withdrawn
- September 2023
Location
Marker shows the centre of Tom Green County; the queue data does not give exact sites.
Other requests in Tom Green County
- Water Valley Wind EnergyOnshore wind Β· 180 MW Β· agreement signed
- Moon Chapel WindOnshore wind Β· 379 MW Β· in study
- Fort Concho Energy storageBattery storage Β· 251 MW Β· in study
- Hofbrau BESSBattery storage Β· 181 MW Β· in study
- Zeppelin Energy StorageBattery storage Β· 164 MW Β· in study
- Dove Creek SolarSolar + storage Β· 164 MW Β· in study
- Dove Creek StorageSolar + storage Β· 163 MW Β· in study
- Morning Glory SolarSolar Β· 122 MW Β· in study
- Knickerbocker StorageOther Β· 25.0 MW Β· suspended
- Rambler SolarSolar Β· 200 MW Β· built
- Angelo SolarSolar Β· 195 MW Β· built
- Ratliff (Concho Valley) SolarSolar Β· 160 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem