United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Bravepost Solar

Bravepost Solar is a 200 MW solar request withdrawn in the ERCOT interconnection queue, in Tom Green County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2018 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. ConsentedOct 2019 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0053
Grid region
ERCOT (Texas)
Developer
Recurrent Energy
Connection point (POI)
6444 Red Creek 345kV
Location
Tom Green County, Texas
Technology
Solar: 200 MW
Total requested
200 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
21 February 2018
Agreement signed
30 October 2019
Proposed online date
December 2024
Withdrawn
September 2023

Location

Marker shows the centre of Tom Green County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Tom Green County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem