United States › Grid › Interconnection queues › Texas

ONSHORE WIND · ERCOT

Azure Sky Wind 1

Azure Sky Wind 1 is a 350 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Throckmorton County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2018 (completed)
  2. Withdrawn / abandonedOct 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0119
Grid region
ERCOT (Texas)
Developer
Tradewind Energy
Connection point (POI)
60515 Clear Crossing 345kV
Location
Throckmorton County, Texas
Technology
Wind: 350 MW
Total requested
350 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
28 June 2018
Proposed online date
September 2020
Withdrawn
October 2019

Location

Marker shows the centre of Throckmorton County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Throckmorton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem