SOLAR Β· ERCOT

Cottonwood Bayou Solar II

Cottonwood Bayou Solar II is a 200 MW solar request withdrawn in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2018 (completed)
  2. Withdrawn / abandonedNov 2022 (project stopped here)
  3. ConsentedMar 2021 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0228
Grid region
ERCOT (Texas)
Developer
Cottonwood Bayou Solar, LLC
Connection point (POI)
tap 138kV 42870 Liverpool - 43070 Petson
Location
Brazoria County, Texas
Technology
Solar: 200 MW
Total requested
200 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
5 December 2018
Agreement signed
25 March 2021
Proposed online date
March 2024
Withdrawn
November 2022

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem