Loma Pinta II

Loma Pinta II is a 202 MW onshore wind request withdrawn in the ERCOT interconnection queue, in La Salle County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2018 (completed)
  2. Withdrawn / abandonedSep 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0166
Grid region
ERCOT (Texas)
Developer
Enerverse
Connection point (POI)
5705 Fowlerton 138kV
Location
La Salle County, Texas
Technology
Wind: 202 MW
Total requested
202 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
27 February 2018
Proposed online date
December 2021
Withdrawn
September 2020

Location

Marker shows the centre of La Salle County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in La Salle County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem