United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· ERCOTLoma Pinta II
Loma Pinta II is a 202 MW onshore wind request withdrawn in the ERCOT interconnection queue, in La Salle County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2018 (completed)
- Withdrawn / abandonedSep 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 19INR0166
- Grid region
- ERCOT (Texas)
- Developer
- Enerverse
- Connection point (POI)
- 5705 Fowlerton 138kV
- Location
- La Salle County, Texas
- Technology
- Wind: 202 MW
- Total requested
- 202 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 27 February 2018
- Proposed online date
- December 2021
- Withdrawn
- September 2020
Location
Marker shows the centre of La Salle County; the queue data does not give exact sites.
Other requests in La Salle County
- La Salle SolarSolar Β· 513 MW Β· agreement signed
- Loma Pinta WindOnshore wind Β· 197 MW Β· agreement signed
- Cotulla BESS 1Battery storage Β· 9.9 MW Β· agreement signed
- Crescent C BESSBattery storage Β· 508 MW Β· in study
- Vazlon Solar SLFSolar + storage Β· 211 MW Β· in study
- Revolution BESSBattery storage Β· 209 MW Β· in study
- Loma Pinta SolarSolar Β· 203 MW Β· in study
- Dahlia SolarSolar Β· 201 MW Β· in study
- Hinkell BESSBattery storage Β· 78.1 MW Β· in study
- Holcomb BESS (Burro BESS)Other Β· 10.0 MW Β· built
- Zircon BESSBattery storage Β· 80.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem