United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTRevolution BESS
Revolution BESS is a 209 MW battery storage request in interconnection study in the ERCOT interconnection queue, in La Salle County, Texas.
Queue statusIn planning
- PlanningQueued May 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget May 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 27INR0254
- Grid region
- ERCOT (Texas)
- Developer
- Nova Clean Energy LLC
- Connection point (POI)
- 8619 Encinal Substation 138KV
- Location
- La Salle County, Texas
- Technology
- Battery: 209 MW
- Total requested
- 209 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 9 May 2024
- Proposed online date
- May 2027
Location
Marker shows the centre of La Salle County; the queue data does not give exact sites.
Other requests in La Salle County
- La Salle SolarSolar · 513 MW · agreement signed
- Loma Pinta WindOnshore wind · 197 MW · agreement signed
- Cotulla BESS 1Battery storage · 9.9 MW · agreement signed
- Crescent C BESSBattery storage · 508 MW · in study
- Vazlon Solar SLFSolar + storage · 211 MW · in study
- Loma Pinta SolarSolar · 203 MW · in study
- Dahlia SolarSolar · 201 MW · in study
- Hinkell BESSBattery storage · 78.1 MW · in study
- Holcomb BESS (Burro BESS)Other · 10.0 MW · built
- Loma Pinta IIOnshore wind · 202 MW · withdrawn
- Zircon BESSBattery storage · 80.4 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem