BATTERY STORAGE Β· ERCOT

Zircon BESS

Zircon BESS is a 80.4 MW battery storage request withdrawn in the ERCOT interconnection queue, in La Salle County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2025 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
27INR0467
Grid region
ERCOT (Texas)
Developer
Zircon BESS LLC
Connection point (POI)
8611 JARDIN 138kV
Location
La Salle County, Texas
Technology
Battery: 80.4 MW
Total requested
80.4 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
27 January 2025
Proposed online date
June 2028
Withdrawn
July 2025

Location

Marker shows the centre of La Salle County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in La Salle County