United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTM-Bar Solar
M-Bar Solar is a 200 MW solar request withdrawn in the ERCOT interconnection queue, in Andrews County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2018 (completed)
- Withdrawn / abandonedJun 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 22INR0201
- Grid region
- ERCOT (Texas)
- Developer
- M-Bar Solar Facility
- Connection point (POI)
- 1141 Holt 138kV
- Location
- Andrews County, Texas
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 9 December 2018
- Proposed online date
- July 2020
- Withdrawn
- June 2019
Location
Marker shows the centre of Andrews County; the queue data does not give exact sites.
Other requests in Andrews County
- Rodeo SolarSolar Β· 200 MW Β· agreement signed
- Solar + storage project GEN-2024-280, Andrews CountySolar + storage Β· 350 MW Β· in study
- Straight Spur StorageSolar + storage Β· 306 MW Β· in study
- Straight Spur SolarSolar + storage Β· 252 MW Β· in study
- Straight Spur WindOnshore wind Β· 247 MW Β· in study
- Trivor BESSBattery storage Β· 206 MW Β· in study
- BRP Kabru BESSBattery storage Β· 203 MW Β· in study
- BRP Kamet BESSBattery storage Β· 203 MW Β· in study
- Tucana BESSBattery storage Β· 201 MW Β· in study
- Desert Rose SolarSolar Β· 200 MW Β· suspended
- Whatley SolarSolar Β· 150 MW Β· suspended
- Eunice SolarSolar Β· 427 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem