United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTDouble R Solar
Double R Solar is a 280 MW solar request withdrawn in the ERCOT interconnection queue, in Kaufman County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2018 (completed)
- Withdrawn / abandonedJun 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0215
- Grid region
- ERCOT (Texas)
- Developer
- Double R Solar Farm
- Connection point (POI)
- 2433 Seagoville 345kV
- Location
- Kaufman County, Texas
- Technology
- Solar: 280 MW
- Total requested
- 280 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 6 November 2018
- Proposed online date
- July 2021
- Withdrawn
- June 2020
Location
Marker shows the centre of Kaufman County; the queue data does not give exact sites.
Other requests in Kaufman County
- Mystic Springs Renewable Energy Solar SLFSolar + storage Β· 259 MW Β· agreement signed
- Sowers StorageBattery storage Β· 204 MW Β· agreement signed
- Erika SolarSolar + storage Β· 201 MW Β· agreement signed
- Eliza SolarSolar Β· 152 MW Β· agreement signed
- Lubio SolarSolar Β· 54.5 MW Β· agreement signed
- Solarville Solar SLFSolar + storage Β· 403 MW Β· in study
- Yellow Leaf II BESSSolar + storage Β· 206 MW Β· in study
- Yellow Leaf SolarSolar + storage Β· 105 MW Β· in study
- Fudge Ranch BESSBattery storage Β· 104 MW Β· in study
- Yellow Leaf BESSSolar + storage Β· 104 MW Β· in study
- Erika BESSSolar + storage Β· 100 MW Β· in study
- Sunbelt SolarSolar + storage Β· 81.5 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem