SOLAR Β· ERCOT

Double R Solar

Double R Solar is a 280 MW solar request withdrawn in the ERCOT interconnection queue, in Kaufman County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2018 (completed)
  2. Withdrawn / abandonedJun 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0215
Grid region
ERCOT (Texas)
Developer
Double R Solar Farm
Connection point (POI)
2433 Seagoville 345kV
Location
Kaufman County, Texas
Technology
Solar: 280 MW
Total requested
280 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
6 November 2018
Proposed online date
July 2021
Withdrawn
June 2020

Location

Marker shows the centre of Kaufman County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Kaufman County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem