United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· ERCOTBlack Angus
Black Angus is a 353 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Webb County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMar 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0064
- Grid region
- ERCOT (Texas)
- Developer
- Apex Clean
- Connection point (POI)
- tap 345kV 1730 WKrum - 6101 Riley
- Location
- Webb County, Texas
- Technology
- Wind: 353 MW
- Total requested
- 353 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 5 March 2018
- Proposed online date
- December 2020
- Withdrawn
- March 2019
Location
Marker shows the centre of Webb County; the queue data does not give exact sites.
Other requests in Webb County
- SieteOnshore wind Β· 493 MW Β· agreement signed
- Cuchillas SolarSolar + storage Β· 306 MW Β· agreement signed
- Corazon Solar Phase IISolar + storage Β· 204 MW Β· agreement signed
- Corvus SolarSolar Β· 202 MW Β· agreement signed
- Seven Flags BESSBattery storage Β· 103 MW Β· agreement signed
- Cedro Hill Wind RepowerOnshore wind Β· 9.9 MW Β· agreement signed
- Torrecillas BESSBattery storage Β· 9.9 MW Β· agreement signed
- Outpost StorageSolar + storage Β· 508 MW Β· in study
- Siete WindOnshore wind Β· 493 MW Β· in study
- Cuchillas BESSSolar + storage Β· 307 MW Β· in study
- Cenizo SolarSolar Β· 301 MW Β· in study
- Bendito WindOnshore wind Β· 300 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem