πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Thickgrass Solar

Thickgrass Solar is a 149 MW solar request withdrawn in the ERCOT interconnection queue, in Matagorda County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2018 (completed)
  2. Withdrawn / abandonedJun 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0133
Grid region
ERCOT (Texas)
Developer
Origis Energy
Connection point (POI)
8115 Wadsworth 138kV
Location
Matagorda County, Texas
Technology
Solar: 149 MW
Total requested
149 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
17 July 2018
Proposed online date
December 2021
Withdrawn
June 2021

Location

Marker shows the centre of Matagorda County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Matagorda County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem