πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Concho Valley Solar

Concho Valley Solar is a 150 MW solar request withdrawn in the ERCOT interconnection queue, in Tom Green County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2018 (completed)
  2. Withdrawn / abandonedMar 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0171
Grid region
ERCOT (Texas)
Developer
Merit SI
Connection point (POI)
tap 138kV 6480 SAPOWER - 6490 Santiago
Location
Tom Green County, Texas
Technology
Solar: 150 MW
Total requested
150 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
1 March 2018
Proposed online date
November 2021
Withdrawn
March 2020

Location

Marker shows the centre of Tom Green County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Tom Green County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem