Point Mountain Solar

Point Mountain Solar is a 514 MW solar request withdrawn in the ERCOT interconnection queue, in Upton County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedMay 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0056
Grid region
ERCOT (Texas)
Developer
Hecate Energy
Connection point (POI)
tap 345kV 11028 Odessa - 76000 N McCamey
Location
Upton County, Texas
Technology
Solar: 514 MW
Total requested
514 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
1 April 2018
Proposed online date
June 2020
Withdrawn
May 2019

Location

Marker shows the centre of Upton County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Upton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem