πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· ERCOT

Altajac

Altajac is a 150 MW gas request withdrawn in the ERCOT interconnection queue, in Cherokee County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2018 (completed)
  2. Withdrawn / abandonedJun 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0132
Grid region
ERCOT (Texas)
Developer
Alta Power
Connection point (POI)
tap 3253 Jaxvlsw to 13253 Bullard 138kV
Location
Cherokee County, Texas
Technology
Gas: 150 MW
Total requested
150 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
17 July 2018
Proposed online date
April 2021
Withdrawn
June 2020

Location

Marker shows the centre of Cherokee County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Cherokee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem