United States βΊ Grid βΊ Interconnection queues βΊ Texas
GAS Β· ERCOTAltajac
Altajac is a 150 MW gas request withdrawn in the ERCOT interconnection queue, in Cherokee County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2018 (completed)
- Withdrawn / abandonedJun 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0132
- Grid region
- ERCOT (Texas)
- Developer
- Alta Power
- Connection point (POI)
- tap 3253 Jaxvlsw to 13253 Bullard 138kV
- Location
- Cherokee County, Texas
- Technology
- Gas: 150 MW
- Total requested
- 150 MW
- Study phase
- FIS Complete
- Queue status
- Withdrawn
- Entered queue
- 17 July 2018
- Proposed online date
- April 2021
- Withdrawn
- June 2020
Location
Marker shows the centre of Cherokee County; the queue data does not give exact sites.
Other requests in Cherokee County
- Lumberjack StorageBattery storage Β· 50.9 MW Β· agreement signed
- Eagle Pines GasGas Β· 1,174 MW Β· in study
- Rogers Creek BESSBattery storage Β· 100 MW Β· in study
- Gas project J480, Cherokee CountyGas Β· 1,240 MW Β· withdrawn
- Ponta Power PlantGas Β· 484 MW Β· withdrawn
- Ponta Power StationGas Β· 459 MW Β· withdrawn
- Solar project GEN-2024-155, Cherokee CountySolar Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem